Project:
Removal UST and Oversight Management
 

Facility ID# :  Non Regulated UST 

DESCRIPTION:

Retained by client. Used City Building Department and Fire Department records to search out and find location of tank. Engaged contractor to remove UST system. Over saw all aspects of the removal of the UST system.  Ordered pumping of materials in tank and blow back into tank of all piping to avoid spillage when removing tank. I oversaw pumping of contaminated water from runoff water that entered into excavation during removal. Ordered removal of contaminated soil and collected and had analyzed soil for disposal.  Collected soil samples at both ends of the UST cavity floor and every 30 ft along the pipe run. Encountered water in the excavation and collected a water sample. Analytical results revealed levels of analytes investigated to be below MDL of laboratory. Engaged a licensed transporter to transport and dispose of approximately 5,850 gallons of oily waste water under manifests.  Completed all paper work for the client.  Engaged a transporter to transport and dispose of 14 cubic yards of broken concrete.  Excavation backfilled with clean sand.  The tank was exempt from regulatory directives under the MDEQ-STD; however, if contamination had been revealed, remedies under MDEQ-ERD would have applied.  Completed project within time and budgetary constraints. 

Duration:

30 Days

Completed Projects:
•  Remediation Project •  Environmental Site Assesment •  UST Removal •  System Design •  Site Closure •  Baseline Environmental Assessment •  UST Release Closure •  Removal of Unregulated tanks •  Legal Involvement •  UST Involvement •  Subsurface Investigation •  Oversight Management •  Subsurface Investigation •  LUST Closure  •  Subsurface Investigation •  Super Fund Project •  Site Assessment •  UST Removal •  UST Involvement •  Baseline Environmental Assessment •  UST Involvement •  Consulting Institutional Controls •  Subsurface Investigation •  Sampling •  Identification of Location of UST •  UST Release Closure •  UST Closure •  Removal Oversight •  Site Closure •  Environmental Site Assessment •  Phase I ESA •  ESA for a Marina •  Limited Subsurface Investigation •  Residential Apartment Complex •  REC Evaluations •  Bulk/Commercial Fueling Station