Standard Practices
QUALITY ASSURANCE, CODES OF
CONDUCT, AND PROFESSIONAL STANDARDS IMPLEMENTED AT ECI
The following ASTM Standard Practices are
used in ECI’s day to day operations:
|
E1527 |
Phase I Environmental Assessment |
|
E1903 |
Phase II Environmental Assessment |
|
D6282 |
Direct Push Soil Sampling for Environmental Site
Characterization |
|
D6001 |
Direct Push Water Sampling for Geoenvironmental Investigations |
|
D1452-80 |
Soil Investigation and Sampling by Auger Boring |
|
D2488 |
Description and Identification of soils |
|
D4220-95 |
Practices for Preserving and Transporting Soil Samples |
|
D4448 |
Guide for Sampling Ground Water Monitoring Wells |
|
D5092 |
Practice for Design and Installation of Ground Water Monitoring
Wells |
|
E1689 |
Guide for Developing Conceptual Site Models for Contaminated
Sites |
|
G158 |
Guide for Assessing Buried Steel Tanks |
|
E1739 |
RBCA Evaluations for Risk Based Corrective Action Applied at
Petroleum Release Sites |
|
D5745 |
Guide for Developing and Implementing Short Term Measures or
Early Actions for Site Remediation |
|
D4700-91 |
Guide for Soil Sampling in the Vadose Zone |
|
D5299-92 |
Guide for Decommissioning Ground Water Wells, Vadose Zone
Monitoring Devices, Boreholes and Other Devices for
Environmental Activities |
All
ECI Personnel are trained in
-
Hazardous Waste Operations and
Emergency Response in compliance with 29 CFR 1910.120(e)(8)
-
OSHA Confined Space
Entry - Entrant and Attendant trained in compliance with 29 CFR
1910.146
-
Certified under Michigan Public Act
440 of 1988 and 40 CFR Part 763 (AHERA)
-
Risk Based Corrective Action (RBCA) and
all of the above listed Standard Practices and Guidances.
|